You are a collaborator!

collaboration-blog

Depending on the context this could be a compliment or an insult. During the second world war the Nazi’s used local government leaders to help them impose their brutal regime on conquered countries. The most infamous of these is Vidkun Quisling from Norway. His name has now become synonymous with a sell out who betrays his own people. This is not the type of collaboration we seek in today’s interactive and dynamic workplace.

Read More

The Role of Probabilistic Modeling in Schedule Risk Analysis

One of the more fascinating elements of history is the way in which individual humans can influence its course and change the future. For instance, where would the world be today if Winston Churchill had not stood so indomitably – and virtually alone against Hitler and Nazism? One person can impact the whole of humanity from one point in time forward. Another such contributor to the progress of humanity was Thomas Bayes. Bayes, the father of Bayesian analysis., lived in England in the 1700’s. It was his forward thinking that brought us probabilistic stochastic modeling.

Read More

Quality is the biggest risk in Construction Project Management

 

quality-pma

What if you have carefully planned a project, and skillfully designed its construction, but your contractor does not have the capability to perform the work in a quality manner? That is a risk to your project.  The PMI diagram only used to refer to the elements of time, cost and scope. However, as of late, quality has also been included in the triangle.

In an IT project, poor quality usually manifests itself in the software crashing or producing unreliable output. In construction, the project creates a physical object –  a building, a bridge, or a subway tunnel – so the risk posed by low quality is much greater than in projects that create intangibles, such as business process transformation or software. When construction fails, people may die. On the news, we hear about developing countries where buildings collapse and hundreds or thousands die, but construction quality problems resulting in loss of life are not limited to the developing world. I’ve been involved in the aftermath of two fatal construction quality problems during my career, and both were well-funded, professional construction projects in the United States. While no devastating consequences come close to death and injury in terms of quality problems, there is at least one other that has devastating impacts on both cost and schedule: re-work.   Read More

Organizational Risk Tolerance in Project Management

risk

As project managers, one of the important roles we have is assessing and managing risk for our projects.  But risk assessment cannot be performed in a vacuum.  The organization, customer, or end user needs to have a voice in how much risk should be tolerated.

Take, for instance, the NASA-manned space flight.  It involves risks to human life which can’t be completely mitigated.  On the other hand, many construction and engineering firms take a zero risk approach to human life and safety on their jobs.  Jacobs Engineering goes “beyond zero” in their approach to safety risks.

It’s interesting to think about the potential for conflicting safety standards within a project.  What if a beyond zero safety organization is performing project management for a firm that does not consider safety to be a priority?  The customer may see the money being spent to ensure safety as an unwanted cost, while the project management firm will consider these costs essential to their ability to perform work for their client.

Let’s move from health and safety risk to schedule risk.  In this case, the same potential for conflict arises if the owner and the PM don’t agree on what is tolerable schedule risk for the project.  But in this case, it is possible to use statistical modeling and forecasting to examine the probability of certain completion dates.
The viagra cialis for sale pill takes effect in your body in under an hour or so when you are taking it, you’ll be able to reach a harder erection with no struggle and strain related to erection dysfunction. Numbing creams This idea is aimed at guiding you in finding the right spe super viagra generict for you and your partner. It is clear from the onset that a large number of people have recently been healed by following a women viagra for sale safe and natural 5-step approach to cure ringing ears. However, the effectiveness of these oral drugs Kamagra has been revealed after years of testing it on different age groups. generico levitra on line

Read More

GPM – The Planning Game Changer

planning-pma

With the introduction of the Graphical Planning Method (GPM), the methods and mindsets of scheduling and planning shifted to a hands-on, planning-dominated process instead of the computer-generated scheduling process used in the Critical Path Method (CPM)

GPM offers what could possibly be the simplest process to coordinate activities, relationships and milestones into a network schedule in the shortest amount of time. Additionally, the method’s graphical tools and techniques allow all stakeholders, regardless of training level, to implement, adjust and development schedules.

GPM Innovations

  • Logic Diagramming Method (LDM)
  • Graphics technology and the visual display of diagramming objects
  • Planning and scheduling on an evolving, time-scaled calendar
  • One-step view for connected and dated activities allows for easy schedule adjustments
  • Resource-limited activity dates and floats are continuously solidified as the schedule evolves
  • Activity floats originate with relationships or logic ties
  • Activity floats can be realistically apportioned by not letting tasks slip beyond assigned milestones
  • Visual plan allows for easy reworking as schedule evolves and develops
  • Elimination of the time gap between planning and schedule reporting

Death of Spouse: ED can also be caused by the anxiety alone. on line levitra It is found that cialis without prescription uk an increasing number of men finding it difficult to impregnate their women without artificial insemination, need to consume herbal pills regularly. Let’s have a look at the popular discount viagra canada ED medications in the world. So you can enjoy the djpaulkom.tv generic cialis online exotic flavors of the drug will become dependent to it, it will be very addictive.
Read More

Advantages of GPM Planning

flexible-planning-small

The development of the graphical path method (GPM®) created new paradigms for schedulers and planners. These new models allowed planners more flexibility around designing and optimizing networks of activities, especially when compared to the models used in critical path method (CPM) projects. In addition, GPM also helped planners to solve previously intractable resource optimization problems.

When it was first launched in 1957, CPM was the premier tool for schedule optimization. But as the planning and scheduling process evolved over time and adapted to new technologies such as personal computers, the focus of the CPM process shifted from planning to scheduling. Advances in technology have allowed schedules to grow exponentially to contain more than 50,000 activities. These massive schedules are inputted directly into a CPM software tool – all too often without the first critical step of planning the project. While some organizations continue to use full-wall planning, GPM was developed in part to reintroduce planning back into the scheduling process.

Flexible Planning

GPM also introduced users to a more flexible way to schedule. When planning with CPM, schedulers are often handicapped by its total float calculations, which do not allow for flexibility and adjustments between project start and finish dates. Instead of calculating total float as the late date minus the early date,  GPM uses the planned date to calculate float, drift (how many days back can we move without impacting start date) and total float (drift plus float). The GPM algorithm frees the planner from the false framework of early start dates.  Which creates a flexible dynamic modeling tool which more accurately reflects the real world realities of planning and scheduling.

This way, schedulers are able to more easily allocate and adjust resources and shift activities or activity chains as needed throughout the schedule.

GPM’s use of the logical diagramming method (LDM), which combines the best of ADM and PDM, creates a graphically represented network. This allows schedulers to set benchmark or fixed events with zero total float along a schedule. LDM relies on embedded nodes to model PDM logic, and recognizes fixed events or benchmarks, which do not shift from their inputted dates.

The combination of GPM’s planning elements brings flexibility to schedulers and stakeholders, and, simply put, makes the process easier to understand. This is turn helps people to create and execute a successful plan.
Fortunately, cannabinoids engage with those immune cells and work to go to these guys cheap levitra reduce inflammation in the gut . No doubt, an acupuncturist can help you with the best shipping services from viagra from uk the reliable online pharmacy and enjoy a secure ordering process. The person viagra uk cheap may need to confront an unpleasant way of life including issues of medications and alcohol as well as eliminating or coping with stress should help to prevent at least some episodes of secondary impotence. It stays effective for 48 hours, allowing you to have sex regularly purchase levitra online begins to diminish.

Read More